Mobile Suit Deployment Checklist
Form AE-FR-79/93 - UC Ordinance 012 Compliant
Confidential | Anaheim Electronics | UC Ordinance 012 Compliant
ANAHEIM ELECTRONICS – MOBILE SUIT DEPLOYMENT COMPLIANCE FORM AE-FR-79/93
(FILED IN ACCORDANCE WITH UC ORDINANCE 012 AND AE-LEGAL 6.2.1, "DENIAL OF LIABILITY FOR PILOT ERROR")
Unit Designation: _____________
Pilot Name: _________________________
Deployment Date: _______________
Pre-Deployment Technical Compliance
1. Core Systems Initialization
- ○Minovsky Reactor Activation – Confirm output within ±2% of rated capacity. Reminder: Output spikes exceeding spec are a "feature," not a warranty claim.
- ○Psycommu Link Check (if equipped) – Verify mental synchronization index is under 82%. Higher readings may result in "Newtype-related anomalies" (see Appendix D: Hallucinations).
- ○Cooling Systems – Ensure thermal control fluid is AE-approved. Substituting coolant with colony tap water voids your service contract.
2. Pilot Interface Verification
- ○Linear Seat Calibration – Align for ergonomic efficiency. AE assumes no responsibility for "spinal compression events."
- ○HUD Color Scheme – Default is AE-Corporate Green™. Unauthorized color changes (e.g., "Char Red") trigger disciplinary review.
- ○Control Stick Dead-Zone – Test responsiveness. If sluggish, ensure debris is not from "personal snack storage."
3. Armament Readiness
- ○Beam Rifle Charge – Calibrate E-Cap to factory settings. AE denies all knowledge of "overclocked" rifles tested in downtown Von Braun.
- ○Beam Saber Integrity – Activate briefly; avoid prolonged ignition in hangar due to insurance premiums.
- ○Fin Funnel Deployment (RX-93 only) – Confirm psychowave harmonics. Misalignment may cause friendly fire... allegedly.
Field Deployment Procedures
1. Launch Bay Protocol
- ○Coordinate Confirmation – Double-check target coordinates. Last year's Granada incident is still "under review" by Legal.
- ○Launch Catapult Safety – Ensure catapult is free of maintenance personnel, supply crates, or unauthorized Haros.
2. In-Mission Conduct
- ○Maintain Comms with Command – Refrain from broadcasting political manifestos mid-sortie.
- ○Monitor Reactor Output – AE provides complimentary dosimeters; failure to wear voids hazard pay eligibility.
- ○Target Identification – Confirm IFF before firing. "It looked Zeon-ish" is not an acceptable debriefing answer.
Post-Deployment Compliance
1. Return Procedures
- ○Docking Approach – Approach at <10 m/s to reduce hangar repair budget overruns.
- ○Debrief Submission – Submit AE-FR-79R in triplicate. Creative writing embellishments will be redacted.
2. Maintenance Handover
- ○Damage Report – Include all hull breaches, scorch marks, or suspicious dents. AE's warranty does not cover "mysterious space debris impacts."
- ○Psycommu Residuals (if applicable) – Purge lingering pilot brainwave signatures before next sortie. HR has ruled that "ghost voices" constitute a workplace hazard.
Safety Reminders from AE Corporate:
- •Mobile Suits are not to be used for personal transport, even on lunch breaks.
- •Unauthorized painting in non-AE colors (e.g., pink) will be prosecuted as "brand dilution."
- •Anaheim Electronics is a neutral defense contractor. Any resemblance to Zeon engineering is "purely coincidental."